|
The Bhadra Dam Right bank power house accommodates one unit of 7.2
MW capacity coupled to a Kaplan-type turbine and one 6 MW unit which
is coupled to the same type of turbine. These units will utilise
the irrigation releases to be let into the right bank canal. The
6 MW capacity generating unit was commissioned on 29.03.1998.
|