KPCL's record achievements :

 

 

  • Highest generation of 26635 million units (2006-2007).
  • Highest thermal generation of 11484 Million Units 2006-07.
  • Highest Plant Load Factor (PLF) of 90.39 % at Raichur Thermal Power Station (2002-2003).
  • Highest capacity addition of 600 MW, in 1999.
  • Highest Annual Turnover of Rs.3387 Crores (2006-2007). Commissioning of Unit - 7 at RTPS in 25 Months - A National record
Generation Performance
Generation
2006-07
2005-06
2004-05
2003-04
2002-03
Thermal 
11484
9165
10730
11393
10292
Diesel + Hydro + Wind 
15151 
10724
8260
7033
6835
Total 
26635
19889 
18990
18426
17127
Thermal Details  
 
 
 
Generation(MU) 
11484 
9165 
10730 
11393 
10292 
Aux.Consumption(%) 
8.22 
8.62 
8.68 
8.50 
8.46 
Plant Load Factor(%) 
89.18 
71.17 
83.33 
88.23 
90.39 
Specific Coal Consumption (KG/KWH) 
0.658
0.660 
0.647 
0.618 
0.642 
Specific Oil Consumption (ML/KWH) 
0.445
0.736 
0.599 
0.742 
0.668 


Performance of Major Hydro Stations (2006 - 2007)
Power Stations
%Age Availability
%Age Auxiliary Consumption
Sharavathi 
97.81  
0.88  
Nagjhari 
94.95  
2.04  
Varahi 
90.61  
1.91  

   Copyright © 2005. KPCL All Rights Reserved.                     Information Act 2005